Hospital de La Zarzuela

Hospital de La Zarzuela
Madrid, Spain. 2008

Developer: Sanitas S.A. de Hospitales
Project and supervision of projectss: EACSN S.L.
Structural: Berra Ingenieros
Mechanical and electrical: Everproject S.L. / Euring
Contractor: Dragados

Budget: 5,0 M €
Built area: 2.307 m2
Completion date: October 2008

The proposed solution considers the construction of several blocks with different heights, attached to the main building, increasing built area in 20%, to improve medical assistance and adapt the building to current Fire Regulations.

The main extension consists of a block with three floors above street level, built on the west of the existing building that actually contains Emergency and adult's Intensive Care .

The new construction starts at basement level and rises to second floor level, with an addition to Emergency in ground floor, a new Surgical Block in first floor and Intensive Care in second floor.

Mechanical plants are also improved with new main electrical board, backup generator, pumps, water chillers, etc